Description
With More and more States/counties getting strict, we have this awesome package for you (compare online at $33k + without solar panels)
NOTE, this package DOES NOT INCLUDE A SOL ARK Inverter
Includes :
All Certifications neccessary for California Inspections
Connection method for batteries.
Connect all batteries in parallel via cable provided to the Sol-Ark
Set the dip switches to position “1” Dip switch ON
Connect all short Cat5 cables between batteries
Battery with Link Port 0 empty will be MASTER (connect CAT5 cable from this battery to Sol-Ark CANBus Port)
Set battery type to Lithium, and thats it!
https://watts247.az3.infogenixdev.com/manuals/battery/PYTES/
https://watts247.az3.infogenixdev.com/manuals/Solar%20Ark/
Instructions to set up communications between PYTES and SOL-ARK (See images in listing)
1) Set Dip switch 1 to ON, for ALL PYTES Batteries
2) Link All PYTES batteries together with CAT5 link cables provided (Link port 1 to Link port 0 of the next battery)
3) Connect CAT5/ 6 cable between OPEN PORT – LINK PORT 0 on battery to CANBUS port on Sol-Ark
4) On SOL-ARK, set BMS Lithium Batt to “00” default
5) Check “Activate Battery” checkbox
6) Exit menu , and click Li-Batt Info, should display real live numbers, disconnect battery comms cable to verify a screen change, to prove communication is successful.